ASSEMBLY OF GLOBAL TANKS

“We are at your service with our team specializing in global tank assembly for your high-pressure gas storage needs in your industrial zone. We perform the precise assembly of global tanks, which are critical for the safe storage of LNG, LPG, nitrogen, oxygen, natural gas, and other industrial gases, in accordance with high-pressure standards and international quality requirements.”
OUR GLOBAL TANK ASSEMBLY PROCESS
1. SITE PREPARATION AND FOUNDATION CONSTRUCTION
2. GLOBE SEGMENT (CALOT) ASSEMBLY
3. WELDING OPERATIONS
4. CONNECTION AND FITTING ASSEMBLY
5. TESTING AND COMMISSIONING
TECHNOLOGIES WE USE IN ASSEMBLY
- Ultrasonic Thickness Measuring Devices (UT): Material thickness control.
- 3D Laser Scanning and Metrology: Millimeter-precise alignment accuracy.
- Automated Welding Robots: Especially suitable for use in internal spherical welding.
- Heat Treatment Furnaces: On-site mobile heat treatment systems.
- Hydraulic Lifting Systems: Precise placement of heavy segments.